Weeks 15 and 16 (12/3 to 12/16): Final playthrough and wrapping up!

With the museum up and running, we worked on documents and instructions to hand off the class. These included a map of all the light switches and power sources in the space, instructions on how to set up, maintain and power down the Misty Window and Typewriter, as well as directions for running the soundscape Read more about Weeks 15 and 16 (12/3 to 12/16): Final playthrough and wrapping up![…]

Week 13 & 14 (11/19 – 12/3): Thanksgiving, Installs and Openings, oh my!

Pop up installation: In our final week leading up to softs on the 28th and the install itself on the 29th, we set up a pop-up installation at the ETC over the weekend.  It was a success and gave us a lot of insight into the layout and presentation of the exhibits and interactive installations Read more about Week 13 & 14 (11/19 – 12/3): Thanksgiving, Installs and Openings, oh my![…]