Home Front: Week Sixteen
Like any good piece of media these days, it seems only appropriate to have a post-credits scene before we truly put the […]
Like any good piece of media these days, it seems only appropriate to have a post-credits scene before we truly put the […]
And on week fifteen, we were finished. Having finalized our design after Softs feedback, our design work work came to an end. […]
The Work This Week: Week Fourteen was a week of locking in design. With only one week left in our process, and […]
The Work This Week: Week Thirteen was a week of prepping for Soft Openings by playtesting. Soft Opening is a two […]
The Work This Week: Week Twelve was a week of turning ideas into something physical. Coming off of Playtest Day, we […]
The Work This Week: Week eleven was spent iterating into playtestable design. After our Halves presentation, the team sat down to figure […]
This week, we presented for Halves. The team took Halves presentation very seriously. In addition to being part of our grade […]
The Work This Week: Week nine was spent preparing for Halves. Halves presentations at the ETC are our first chance to publicly […]
The Work This Week: Week eight was spent iterating and playtesting. Capitalizing off of the momentum of last week’s breakthroughs, we aimed […]
The Work This Week: Week seven was spent taking our ideas finding ways to put them into practice. On Monday, we spoke […]