[Production]
This week we finalized our product build, and installed all the hardware with the software files in A104 at Heinz College building.
Then we conducted a training session with the teaching assistants, along with the client audited in the room.
We also made user manual and technical instruction for TA to use next semester.
We recorded a tutorial video for their future usage as well.