Soft Opening week! Our team worked very hard over the weekend to get our project to a place for soft opening. For soft opening we needed to effectively be done with our project – having all of our changes and feedback from halves implemented. Please see some of our updates below!
Home Screen Update: The original homepage is on the left and updated is on the right.
Sticker Book Updates: The original sticker page is on the left and updated is on the right. Also note the updated UI controls on the lower left of the screen
Space:
Ocean:
Forest:
Badge Library Updates: Here is the progression from left to right of how the libraries have evolved over the semester.
Space:

Ocean:

Forest:

Badge Artwork: All of our badges were completed as well this week. Including (5) additional reserve badges for all three libraries.
Space Additional Badges:
Ocean Additional Badges:
Forest Additional Badges:
Physical Badges: We also redesigned our physical badges. The new design has a horizontal orientation and a larger QR code, which we found would be easier for the students to scan.
